Interconnection Timelines and Costs for Distributed Energy Projects in the United States (2000-2025)

Publication Type

Report

Date Published

06/2026

Authors

Abstract

These slides summarize and explain empirical data on interconnection timelines and costs for distributed energy projects connected to U.S. utility distribution systems. The study explores how interconnection metrics vary across states, project sizes, technology types, and over time to indicate progress toward simple, fast, and affordable interconnection. Data encompasses 188 utilities in 24 states. Project types include biomass/biofuels, coal, hydropower, natural gas/oil, solar, storage, wind, hybrid, and other technologies.

Year of Publication

2026

Notes

A webinar discussing this research was held on May 27, 2026. The presentation slides can be viewed here